The Farcimar S.A. has developed, manufactured and installed a set of prefabricated elements of reinforced concrete for the construction of the North Stadium Bench António Coimbra da Mota - Estoril.
With this work it was possible, once again demonstrate the versatility of the precast concrete benches solution Farcimar SA and to structures for implementing this type with a capacity very quickly, and this work was completed in a record time (about 60 days).
The work that began in late June, was completed in early August to receive the first home game of the first football league.
The structural solution to the North Stadium Bench António Coimbra da Mota - Estoril is a solution composed of the combination of columns, beams, bench steps, passing steps and precast panels in concrete, a total of 3000 seats, reaching 8000 seats required by UEFA to a club that is competing in the Europa League, as is the case of the Estoril-Praia.
The design and development of the adopted structural solution and the manufacture was the Farcimar, S.A. responsibility having its assembly on the spot been borne by the Arouconstrói, S.A.